Free Bill of Materials (BOM) Calculator

Your Bill of Materials

Replace the example rows with your own materials, quantities, and costs.

finished units
Material Qty / batch ? I paid ($) I bought Cost / unit made
Labour
Packaging goes in the materials list above, as its own line - it's a material too. Labour is the one cost that isn't, so it gets worked out from your time and rate instead of a number you'd have to already know. Uses the batch size set above to split the cost across each unit.
Labour cost per unit: $0.00
True cost per unit
$0.00
Materials (including packaging) + labour, for one finished unit

Get the Excel template

The same BOM structure as this calculator, as an Excel file with formulas built in. One sheet per product.

Save your results

We'll email you a copy of this Bill of Materials.